
This is what our site looked like 2 weeks ago. oops. I had meant to post it but got SOOO busy I totally forgot. Why? See my next post!
But back to the building site: All the boarding up had been done to pour the foundations, the metal had been placed for the columns…


Then me and Vincent went to oversee the pouring of the concrete. A lot of guys running around, trucks coming in regular intervals, noisy and busy.
We even had a horse come to visit from the neighbouring property to help make sure it was all done properly.




I got closer to watch the sludge being poured in.

They have prepared for the slab that the container will sit on, that gets poured next week.

Here is the view from the main road above our place. We’re in the valley down low, but from up here you can see us and the sea!

I’ll leave it at that for now, just to share this post. Then I’ll get onto posting about what kept me so busy…
z
